Impressive works done in Kortrijk for the heating network extension

On Saturday 20 October 2018 Kortrijk wrote a new chapter in its heat story! A 9,000-tonne tunnel was pushed under the railway and the tubes for the heating network were also extended from Kortrijk Weide to Campus West.

This connection provides a significant expansion of the heating network and makes it possible to connect the buildings of UGent and HoWest to the heating network. The residual heat of the new swimming pool can then not only heat the locations in the shed, but also the buildings on Campus West.

A timelapse was made of this mammoth task - the installation of the bridge and the connection of the pipes - which is available here. More pictures can be seen here and on the Kortrijk heating network website (in Dutch).

Share this

Tweet Share